Maintenance Plan - ATT Nussbaum SMART LIFT 2.30 Manuel D'exploitation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7.1

Maintenance plan

i
Before beginning service, disconnect from power. The work area around the lift is to be secured against
unauthorized use.
Visual
Spray
inspection
Time frame
Type of
maintenance
12
1
11
2
10
365 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
106
Oil
Lubricate
B
P
C
F
D
E
N
M
L
O
K
J
Model and information signs, labels, brief operating instruc-
tions, safety stickers and warning information are to be
cleaned and exchanged if damaged.
Lubricate the lubrication nipple at the upper end of the lift
spindle bearing with a multi-purpose grease. For this, the spin-
dle cover (g) must be removed in advance and pulled out
upwards.
Do not over-lubricate.
Check the poly v-belt for wear;
Tighten if required (see manual in the detailed documenta-
tion)
Clean with
compressed air
A
1
2
4
3
G
H
Q
Maintenance plan
OPI_SMART LIFT 2.30 SL-2.35 SL-2.40 SL_V3.1_DE-EN-FR-ES-IT
Clean
Inspect
Pos.
Model
and
infor-
mation
signs
A
B

Publicité

Table des Matières
loading

Table des Matières