Installation Of The Thrust Tunnel; Drilling The Holes In The Thrust-Tunnel - Vetus BOW5512A Manuel D'utilisation Et Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 33
Corrosion of a steel or alu-
minium thrust tunnel can be
reduced by ensuring that
the tail piece is completely
insulated from the thrust-
tunnel.
NOTE: The gaskets sup-
plied are already electrically
insulated. However the bolts
and the shaft need to be fit-
ted with insulation material,
for example nylon bushes (
* Ã ).
Installation
For installation examples see page 61.
For outside dimensions see page 64.

Installation of the thrust tunnel

Drill 2 holes into the ship's
hull, where the centerline of
the thrust tunnel will be, in
accordance with the diam-
eter of the marking tool.
Pass
the
marking
tool
(home-made) through both
pre-drilled holes and set out
the outside diameter of the
thrust-tunnel to the hull.
Dependent on the vessel's
construction material, cut
out the holes by means of
a jigsaw or an oxy-acetylene
cutter.
Install the thrust-tunnel.
14
020522.08
Polyester thrust tunnel:
Resin: The resin used for the polyester thrust tunnel is
Isophtalic polyester resin (Norpol Pl 2857).
Pre-treatment: The outside of the tunnel must be rough-
ened.
Remove all of the top surface down to the glass-fibre. Use
a grinding disc for this.
Important: Treat the end of the tunnel, after it has been
sawn to length, treat the end of the tube with resin. This
will prevent water seeping in.
Laminating: Apply a coat of resin as the first coat. Lay on
a glass-fibre mat and impregnate with resin. Repeat this
procedure until you have built up a sufficient number of
layers.
A polyester thrust tunnel
should be finished as follows:
Roughen the hardened resin/
glass-fibre. Apply a top coat of
resin. Treat the side of the tun-
nel which comes into contact
with water with 'epoxy paint'
or 2-component polyurethane paint.
Then apply anti-fouling treatment if required.

Drilling the holes in the thrust-tunnel

Mark the installation position
of the bow thruster by means
of the intermediate flange.
Use the drill pattern supplied,
D = 160 mm
to determine the correct posi-
(6.30")
tion of the holes to be drilled.
Important: The pattern of the
holes must be positioned pre-
cisely on the centerline of the
tunnel.
Drill the holes through the
thrust tunnel and take care that
the holes are free of burrs.
Operation manual and installation instructions Bow thruster 55 kgf, ø 150 mm
D = 30 mm
(1.18")
d = 9,0 mm
(0.35")

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bow5524aZe250Ze125Bow7512Bow7524

Table des Matières