Connection Process For The Can Communication For Li-Ion Batteries With Bms - Ingeteam INGECON SUN STORAGE 1Play TL M Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Connection of the CAN communication for Li-Ion batteries with BMS
13.3. Connection process for the CAN communication for Li-Ion
batteries with BMS
To carry out the connection of the CAN communication, follow the steps below:
1.
Pass the CAN communication wiring through the dedicated cable grommet (see section
of cable
inlets").
2.
Connect the wiring to terminal J8 BMS as shown in the previous figure, respecting the printed
instructions on the screen-printed electronic card (CAN_L, CAN_H).
3.
Guide the cable and hold it if necessary on the plastic support.
4.
Check that the connection is tight.
ABH2014IQM01_A - Installation and Operation Manual
Ingeteam
EN
ES
FR
PT
"2.5. Description
37

Publicité

Table des Matières
loading

Table des Matières