Storage System Connection Process - Ingeteam INGECON SUN STORAGE 1Play TL M Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Connection of the storage system

8.3. Storage system connection process

To connect the storage system:
1.
Pass the storage system wiring through the dedicated cable grommet, respecting the polarities.
2.
Remove the M5 bolts and connect the wiring to the terminals marked as J105 BATTERY + and
J06 BATTERY - respecting the polarities.
3.
Tighten the M5 bolts with a torque of 2.5 Nm to ensure they are properly fastened.
4.
Check that the connection is tight.
ABH2014IQM01_A - Installation and Operation Manual
Ingeteam
EN
ES
FR
PT
27

Publicité

Table des Matières
loading

Table des Matières