5 Handle operating elements
5.1 2-cycle function of the trigger
6 Putting into operation

7 Putting out of operation

The required contact pressure is pre-set via the pressure adjustment knob (4) or
is readjusted during the welding process.
NOTE
• As the MIG/MAG welding torches are integrated into a welding system,
the operating instructions of the welding components, such as the
welding power supply, must be observed during operation.
Using a standard welding torch, the two-cycle mode of the trigger can be
activated. Further operating modes and handle modules depend on the
corresponding welding power supply and must be ordered separately.
1 Press the trigger on the handle and keep it pressed = welding is started.
2 Release the trigger = welding is stopped.
1 Open the shielding gas cylinder.
2 Switch on the power supply.
3 Set the welding parameters.
4 Start welding.
NOTE
• Hose assemblies containing PVC hoses will start leaking if the return
coolant temperature is exceeded. Make sure not to exceed a return
coolant temperature of 60°C.
NOTE
• Liquid-cooled cable assemblies may start leaking if overheated. This is
why the cooling unit should continue running for approx. 5 min. after
welding.
1 Stop welding.
2 Wait until the shielding gas flow has subsided and then switch off the power
supply.