Dometic SP950C Instructions De Montage page 8

Masquer les pouces Voir aussi pour SP950C:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 12
Guarantee
Fit the fastening frame and the condenser at the Scania Highline/Topline as follows:
➤ Bolt the condenser unit to the mounting frame with the M8 x 30 hexagon bolts,
M8 8.4 x 16 mm U-washers and M8 retaining nuts (fig. 1, page 3).
➤ Remove the existing screws (fig. 2 1, page 4).
I
NOTE
Make sure the long side (fig. 2 A, page 4) of the spacer is pointing
towards the rear wall of the truck.
➤ Fasten the spacer (fig. 2 2, page 4) in place of the removed screw using the
M8 x 25 ribbed bolt (fig. 2 3, page 4).
➤ Remove the existing nuts (fig. 2 6, page 4).
➤ Install the mounting frame using the fastening material provided:
– Attach at the top with the M8 (fig. 2 6, page 4) serrated lock nuts
– Attach to the spacer you installed earlier with retaining nut M8 (fig. 2 4,
page 4) and bolt M8 x 16 (fig. 2 5, page 4)
➤ Check that all bolts are still tight after travelling approximately 200 km.
6
Guarantee
The statutory warranty period applies. If the product is defective, please contact the
service partner in your country (addresses on the back on the instruction manual).
Our experts will be happy to help you and will discuss the warranty process with you
in more detail.
8
CoolAir SP950C, SPX1200C
EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Spx1200c

Table des Matières