Assembling The "Cold Handle; Assembly And Placement Of Coalbunker (Optional); Finishing; Packaging Materials - Dovre 640 GM Installation Et Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.2.2. Assembling the "cold handle"

Assemble the different parts of the handle, i.e. a screw
M8x50, a wooden handle and a nut, as indicated on the
sketch.

3.2.3 Assembly and Placement of coalbunker (optional)

For the placement of the coal-
bunker, one should follow these
instructions:
Remove the top panel (which is
located loosely on the interior top
panel) togethe r with the filling lid.
Remove the flame sheet (which
consists of two parts).
The bunker can now be placed
inside the appliance. It should be
placed against the edges of the
interior top panel. Make sure that
the longest side of the bunker is
placed at the back.
Place the top panel and the filling
lid on the appliance again.
3.3.

Finishing

When the stove is placed in the final position and hermetically connected to the
chimney, you can replace all of the loose parts.
Your stove is now ready for use.
Attention: never light a fire with the inner plates or refractory stones removed.
3.4.

Packaging materials

Packaging materials should be disposed of in a responsible way and in accordance
with governmental regulations.
640GM - 760GM
coalbunker
Flame sheet
28
Filling lid
Top panel
Recycle plate
Interior top panel
03.27602.000

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

760 gm

Table des Matières