Télécharger Imprimer la page

Wichard SPARCRAFT Notice De Montage page 6

Mâture

Publicité

Les langues disponibles

Les langues disponibles

P R E - A S S E M B L Y C O N N E C T I O N S
3
Drilling holes and pre-assembly
We are talking here of a pre-assembly, not a final assembly
- without fixing - of the aerials and lights:
- pass the cables through using the messenger lines;
- carry out the drilling, put in position the brackets;
- carry out the pre-assembly of the mast head equipment
and deck lighting, taking care not to damage the sheaves;
- run through the cables that are required (additional lights
Take particular
and VHF) or planned for the future;
care when drilling
not to damage
- Fill in around the holes to make them watertight;
anything
- position the VHF aerial upside down (risk when being lifted);
- check the holes at the foot of the mast.
Passing through the messenger lines
You can leave one or more messenger lines
in case of any future connections.
R U N N I N G R I G G I N G
4
Front side - fore halyards / Rear side - rear
halyards
Run the halyards through using the messenger lines (not for
the pre-assembled halyards). Position the mast:
- front side downwards for the fore halyards;
- rear side downwards for the rear halyards;
- check that all of the halyards are clear, (not caught anyw-
here), are parallel to the exit holes from the mast and are
free to move (exit from sheaves);
- make a knot to hold each halyard in place ("figure of eight knot").
4 /
w w w . s p a r c r a f t . c o m

Publicité

loading