Télécharger Imprimer la page

Wichard SPARCRAFT Notice De Montage page 12

Mâture

Publicité

Les langues disponibles

Les langues disponibles

P R E C A U T I O N S B E F O R E S T E P P I N G T H E M A S T
6
- Fitting from the top: prepare the fragile elements (aerials and/or wind
indicators), but do not fix them until the mast is stepped and checked
(temporary fitting of aerial upside down before lifting). Please consult the
instructions from the manufacturers of such equipment and the recom-
mendations from the crane-driver during the lifting process.
Checking the cables and connections
- any electric shock can cause corrosion.
Please check the condition of the cables and
the bulbs in the navigation lights. Have them tested if
necessary;
- Check the electrical connections and protect them with
an appropriate product.
Final visual check
Planted mast should read keel stepped mast : check the posi-
tion of the watertight system inside the mast (generally found
at the lowest halyard exit). You should only see daylight
through the central tube for the electric cables. No light should
pass through the main section
10 /
Masthead equipment
- Fitting of equipment (navigation lights,...) on land:
complete this installation at the end. Cut down the
amount of times you have to climb the mast and make
sure they fit before stepping;
w w w . s p a r c r a f t . c o m

Publicité

loading