CARVIN Gold Série Manuel Du Propriétaire page 48

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2.2 PATIO SLABS INSTALLATION (OPTIONAL)
2.2.1 To have a more solid base under the bottom plates,
you can install patio slabs under each plate. To do so,
mark the location of each bottom plate and disassemble
plates and rails. Patio slabs must be buried at the same
level as the previously compacted rock dust. All slabs
must be even to ground level rmly supported under-
neath and level to all others.
2.2.2 Reposition bottom plates and rails following steps
2.11 and 2.12.
2. THE FOUNDATION
(continued)
Patio slab
Measure the diameter from the center of the
pool to the interior of the grooves on the rails
46.

Publicité

Table des Matières
loading

Produits Connexes pour CARVIN Gold Série

Table des Matières