Finishing; Packaging Materials - Dovre 1900GL Installation Et Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Convection chamber:
The convection chamber topside must be airtight. For that purpose, you can use a
cover of steel, concrete, or any other fire-resistant material, and put extra insulation
on top of it. Make sure that the cover is well horizontally placed.
The cover must be installed at 30 cm at least above the smoke dome. The outlet
grids must be installed straight under that cover. Make sure that convection outlet
area is big enough: minimum 500 cm².
In the convection chamber no combustible material must be used. Make sure that,
when using other auxiliary material such as steel, it will not function as a heat
bridge.
The picture on the next page shows an example of fireplace installation within
combustible
3.4.

Finishing

When the appliance is installed in the right place, its connection with the chimney
made airtight, and the masonry mantle completely mounted, all loose parts are in-
stalled in the appliance.
Your fireplace is now ready to be used.
Depending on the materials used for mounting, it is recommended to wait for some
time until all masonry is dry before lighting a fire.
Attention: never light a fire with the inner plates or refractory stones removed.
3.5.

Packaging materials

Packaging materials should be disposed of in a responsible way and in accordance
with governmental regulations.
material.
1900
36
03.27831.100

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1900vg

Table des Matières