Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
Important:
The battery pack is not fully charged when you purchase
it. Before using the tool for the first time, refer to
Battery Pack (page
1
Unfolding the Handle
Parts needed for this procedure:
1
Allen wrench
Procedure
1.
Unfold the handle (A of
2.
Align the locking button on the lower shaft with the slotted hole on
the upper shaft and slide the 2 shafts together (B and C of
Note:
The locking button clicks into the slotted hole when the shafts
are secured (D of
3.
Using the provided Allen wrench, tighten the screw on the shaft
connector until it is secure (E of
Description
Allen wrench
Auxiliary handle assembly
Edger adjustment tool
21).
Figure
Figure
Qty.
1
1
1
3).
3).
Figure
3).
12
Use
Unfold the handle.
Install the auxiliary
handle.
Charging the
Figure
3).