Start Up; Long Coffee Gigleur - Gaggia XE-XD EVOLUTION Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6 - START UP

1.
Tap
2.
Hot Water Outlet Button XD
3.
Hot Water Outlet Switch XE
4.
Machine on/off indicator
5.
Gas on/off valve
6.
Main switch
7.
Right Vaporiser Tap
8.
Left Vaporiser Tap
9.
Cup-warmer switch
10.
Boiler pressure gauge
11.
Pump pressure gauge
12.
Boiler level indicator
13.
Right Vaporiser Pipe
14.
Left Vaporiser Pipe
15.
Hot Water Outlet Pipe
16.
Unit XD Control Keyboard
17.
Unit XE Control Keyboard
18.
Hot Water Outlet Indicator
19.
XD Delivery Led
20.
XE Delivery Led
Once the water, gas and electrical connections have been made,
proceed to start up the machine.
Open the mains water supply tap (A).
Close the protection switch (D)
Position the machine main switch (8) to position
indicator will come on (3).
The auto-levelling device will come into operation so that the water
reaches a normal level in the boiler (12).
Position the main switch (6) to position
power or to position
for operation at full power, thereby powe-
ring the resistances.
Wait for the pressure to reach its operational pressure 1.1÷1.3 atm
checking the boiler pressure on the gauge (10).
Should the machine fail to stabilize on the indicated values it is necessary
to calibrate the pressure switch as described in paragraph 6.2.
In the event of a machine featuring a gas heating system, it is necessary
to switch on the gas by operating the gas valve (4) after operating the
main switch (6), keeping the piezoelectric switch pressed (5) until the
gas remains on.
Then check the pressure on the pump gauge (11) putting a unit into
operation with filter holder engaged filled with ground, dosed and
pressed coffee in order to achieve an effective working pressure of
8/9 atm.
Should re-calibration of the pump pressure be necessary this operation
should be undertaken as indicated in paragraph 6.3.
The machine is now ready for use.
8
11
14
12
Fig.6.01
IMPORTANT
the machine on
The machine is fitted with a gigleur ( 1 per unit) with a clearance of
for operation at normal
0.6 mm (Cod.26G0074/01).
For greater coffee delivery speed, in the case of long coffees, no.2
gigleurs are also included with the machine (complete with seals) with
a clearance of 0.8 mm (Cod.26G0073/01).
The gigleur is located in the exchanger supply fitting (1 per group).
Fig.6.02
29
16
19
2
18
1
15
4
5
Do not press the hot water delivery switch or but-
ton (2) before the correct working temperature
of 1.1 atm is reached, as indicated on the boiler
gauge (10).
6.1

LONG COFFEE GIGLEUR

ENGLISH
17
20
7
10
3
9
13
6

Publicité

Table des Matières
loading

Table des Matières