Side Opening; Vertical Floor Or Wall Installation - Panasonic Aquarea Air U.M. Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

U
I
S
2.4

Side opening

-
On the left-hand side lift the cover that protects the
screw, loosen the screw that fixes the left panel, then
move it slightly to the left and lift it up.
A
cover
B
fixing screws
2.5

Vertical floor or wall installation

When mounting on the floor with support feet, refer to the
individual instructions leaflets supplied and the relative
manual for the mounting of the feet.
Using the paper template, trace the position of the two
fixing brackets on the wall. Use a suitable drill to make the
holes with and insert the toggle bolts (2 for each bracket);
fix the two brackets. Do not over-tighten the screws so
that the brackets can be adjusted with a spirit level.
A
toggle bolts
A
B
C
A
B
-
On the opposite side, lift the cover that protects the
screw and unscrew it.
-
Move the side panel slightly to the right and lift it out.
C
left panel
D
right panel
A
B
D
Fully tighten the four screws to block the two brackets.
Check the stability by manually moving the brackets to the
right and to the left, up and down.
Mount the unit, checking that it fits correctly onto the
brackets and checking that it is stable.
B
brackets
A
B
INSTALLATION
EN
7