Télécharger Imprimer la page

Special Functions - Dimplex WPM 2006 plus Instructions De Montage Et De Service

Masquer les pouces Voir aussi pour WPM 2006 plus:

Publicité

Les langues disponibles

Les langues disponibles

Configuring the Heat Pump Heating System

6.4 Special Functions

Depending on the system configuration, the "Special functions"
menu contains the following options for changing the current
operating statuses:
ATTENTION!
Special functions should only be activated by a technician to carry out
start-up or an analysis of the heat pump system.
Activation of special functions
By activating the "Compressor switch" function, the
compressors can be switched during operation in
the case of heat pumps equipped with 2
compressors
By activating the "Quick start" function, the heat
pump can start up after the safety-related periods
have elapsed. A switching cycle block is
overridden.
By activating the "Lower operating limit deactivate"
function, the heat pump can start up after the
safety-related periods have elapsed. Periods for
optimizing the energy efficiency of heat pump
operation are overridden.
By activating this function, defrosting is disabled for
one hour in the case of air-to-water heat pumps.
The 2nd heat generator is enabled. If defrosting is
taking place, it will be terminated.
Function testing of pumps and mixer
By activating this function, the primary side pumps
are switched on constantly for a period of 24 hours.
The heat pump remains blocked during this period.
By activating this function, the secondary side
pumps are switched on constantly for a period of 24
hours. The heat pump remains blocked during this
period.
By activating this function, the hot water pump is
switched on constantly for a period of 24 hours.
The heat pump remains blocked during this period.
By activating this function, the mixers in the system
are firstly moved in an OPEN and then in a
CLOSED direction for the set mixer runtime
Automatic programme for targeted heat drying of
screed floors
Sets the maximum return temperature to be
reached during initial heating
Selecting this function will permit any request for
domestic hot water or swimming pool water during
initial heating
Activates the initial heating program
Activates the standard program for screed drying
Sets the duration of the individual steps during the
heating-up phase
Sets the maintaining time
6.4
Display
No
2 Compressors
Yes
No
Always
Yes
No
Brine-to-water HP
Yes
No
Air HP
Yes
Always
No
Always
Yes
No
Always
Yes
No
Always
Yes
No
Always
Yes
Always
25° C
Always
... 40° C...
50° C
No
Always
Yes
No
Always
Yes
No
Always
Yes
1
Always
... 24...
120
1
Always
... 96...
480
EN-19

Publicité

loading

Ce manuel est également adapté pour:

Wpm 2006 rWpm 2007 plusWpm 2007 r