Hang The Door Panels - Kohler K-1000-H2 Instructions D'installation

Masquer les pouces Voir aussi pour K-1000-H2:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Header
Roller
SIDE
DOOR
PANEL
Bushing

16. Hang the Door Panels

Hang the Side Door Panels
Fit a bushing over each outside track roller in the header.
With assistance, lift one of the side doors into place, and fit an outside track roller into each of the
two holes in the glass.
Insert another bushing into each hole from the opposite side of the glass. Thread a roller nut into
each roller. Carefully hand tighten each roller nut. Do not tighten with a wrench at this time, and
do not try to level the door panels yet.
Repeat for the other side door.
Hang the Center Door Panel
Fit a bushing over each outside track roller in the header.
With assistance, lift the center door panel into place, and fit an inside track roller into each of the
two holes in the glass.
Insert another bushing into each hole from the opposite side of the glass. Thread a roller nut into
each roller. Carefully hand tighten each roller nut. Do not tighten with a wrench at this time, and
do not try to level the door panels yet.
Kohler Co.
Bushing
Roller Nut
Bushing
15
Header
Roller
CENTER
DOOR PANEL
Bushing
Roller Nut
1032118-2-A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-1015K-1016K-5161

Table des Matières