Connect The Tower And Pump - Kohler K-1000-H2 Instructions D'installation

Masquer les pouces Voir aussi pour K-1000-H2:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Mounting Frame
Union Nut
Pressure Switch
Pump

8. Connect the Tower and Pump

NOTE: The tower inlet subassembly comes assembled and is included with the footbath.
Use a level and measuring tape to confirm a minimum 1/4" (6mm) per foot (30.5cm) pitch toward
the pump. If the subfloor is not level, shim as needed.
Detach the tower inlet subassembly located near the heater.
Attach the tower inlet to the tower using the mounting frame union nut. Make sure the O-ring is in
place.
Attach the other end of the tower inlet subassembly to the pump outlet. Make sure the O-ring is in
place.
Kohler Co.
Mounting
Frame
O-Ring
Tower Inlet
Subassembly
O-Ring
9
Pump Drainage
Ensure minimum 1/4" (6mm)
pitch per foot (30.5cm) toward
suction assembly
1032118-2-A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-1015K-1016K-5161

Table des Matières