Complete The Installation - Kohler K-4918 Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Install the Urinal (cont.)
Verify the urinal is properly positioned, then remove the urinal
from the wall.
NOTE: If adjustment is necessary, make vertical adjustments along
the slots on each wall hanger until the urinal can be tightened to the
collar.
Install permanent screws or lag bolts into the holes on the wall
hangers, as shown on the installation template.
Carefully position the urinal on the wall hangers, then secure the
urinal to the bracket using the washers and bolts provided.

3. Complete the Installation

Pour 1/2 gallon (1.89 L) of water into the trapway.
Check for leaks. Repair as needed.
Pour 3 ounces (89 ml) of sealing liquid (provided) into the
trapway. The sealing liquid will float on top of the water in the
trapway.
Position the strainer in the drain hole.
Set the urinal ball in the urinal.
Kohler Co.
All manuals and user guides at all-guides.com
5
1048745-2-F

Publicité

Table des Matières
loading

Table des Matières