Complete The Installation - Kohler K-6918 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10. Install the Faceplate
Install the locking pins into the mounting frame.
Turn the locking pins to the "OPEN" position.
Align the mounting frame with the tank opening and install the
frame.
If needed, trim the locking pins.
Turn the locking pins to the "LOCK" position.
Engage the bottom of the faceplate with the tabs.
Tilt the faceplate up over the push rods and press into place.

11. Complete the Installation

Turn on the water supply.
Turn on the tank water supply.
Check for leaks.
Press the left side of the faceplate to confirm the full flush is
operating correctly.
Press the right side of the faceplate to confirm the eco-flush is
working correctly.
Kohler Co.
Open Position
Mounting
Frame
Lock Position
13
1287824-2-A

Publicité

Table des Matières
loading

Table des Matières