Complete The Installation; Terminer L'installation - Kohler K-11660 Guide D'installation Et D'entretien

Drain de baignoire
Table des Matières

Publicité

4.

Complete the Installation

Insert the plunger assembly into the overflow ell.
Attach the pin on the plunger assembly to the backside of the hood.
Wrap thread sealant tape around the threads of the two flathead screws
(provided). This will prevent water weeping through the mounting holes on the
overflow ell.
Secure the hood to the overflow ell with the two flathead screws. Do not
overtighten the screws.
Make all final plumbing and drain connections.
Push the lever down on the hood to close the drain.
Fill the bath with water, then check for leaks.
Check for proper operation of the lever. If necessary, refer to the "Plunger
Assembly Adjustment" section.

Terminer l'installation

Insérer l'ensemble du plongeur dans le coude du trop-plein.
Attacher la goupille sur l'ensemble du plongeur sur le côté arrière du couvercle.
Envelopper du ruban d'étanchéité autour des filetages des deux vis à tête plate
(fournies). Ceci préviendra l'eau de passer à travers les orifices de fixation du
coude du trop-plein.
Sécuriser le couvercle sur le coude du trop-plein à l'aide des deux vis à tête plate.
Ne pas trop serrer les vis.
1114757-2-A
All manuals and user guides at all-guides.com
Hood/Capot/Placa
Screw/Vis/Tornillo
12
Kohler Co.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-11666K-11677

Table des Matières