Taking Into Operation; Maintenance/Servicing; Repairs / Overhaul / Modification; Disposal/Recycling - Eaton Crouse-hinds Série GHG 713 Mode D'emploi

Boîtier vide
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6.5

Taking into operation

Prior to taking the apparatus into operation, the tests specified in the
relevant national regulations will have to be carried out.
Apart from that, the correct functioning and installation of the apparatus
in accordance with these operating instructions and other applicable
regulations will have to be checked.
Incorrect installation and use of the junction boxes can invalidate
the guarantee.
7

Maintenance/Servicing

The required maintenance intervals are set according to their
application and should therefore be determined depending on the
conditions of use.
If during servicing repairs prove to be necessary, section 8 of these
operating instructions will have to be observed.
8
Repairs / Overhaul / Modification
Repairs and overhaul may only be carried out with genuine COOPER
CROUSE-HINDS / CEAG spare parts.
Repairs may only be carried out by COOPER CROUSE-HINDS or a
qualified electrician (Competent person) in compliance with the
applicable national rules.
For replacement and repair only original parts from COOPER
CROUSE HINDS-/ CEAG may be used.
Modifications to the apparatus or changes of its design are not permit-
ted, except for the mounting of additional cable entries and the installa-
tion of supply terminals in accordance with the approval of the apparatus.
9

Disposal/Recycling

When the apparatus is disposed of, the respective national regulations on
waste disposal will have to be observed.
Empty enclosures GHG 713
GB
13

Publicité

Table des Matières
loading

Table des Matières