Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

10
After installing the autoclave proceed with preparation and use.
10.1 Turn on the autoclave and barometric alignment
Press the main switch (Fig.A–pos.13). After the display of the logo, the autoclave checks
the memory and the connections. Once checks are over the autoclave shifts to the
operating setup.
Open the door and wait for some seconds until an acoustic signal informs that the
automatic barometric alignment values have been acquired; at the same time the display
shows the message DOOR OPEN.
10.2 Clean water tank filling
Connect the hose supplied (Fig. 8) to the front fitting of the autoclave (Fig. A-pos.08).
Put the other end of the hose with the filter inside the demineralised or distilled water
container.
At this point, press the
it pressed until the countdown appears.
The pump loads the clean water tank inside the autoclave. If the maximum level is not
achieved within 180 seconds the pump stops automatically and it will be necessary to
press button B-PUMP.
The pump stops automatically when the maximum level is achieved.

USE INSTRUCTION

THE AUTOCLAVE IS READY FOR USE
PUMP WATER
button to operate the water loading pump and keep
ENGLISH
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Europa b pro 20Europa b pro 24

Table des Matières