Tecno-gaz europa B pro Mode D'emploi page 77

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

The following steps are recommended by the manufacturer. These operations must be
performed only by trained technicians authorized by the manufacturer.
Replacement of the water loading filter
Control of the water filter of flowmeter inlet
Cleaning Y brass filter downstream of the radiator
EV4 (water loading solenoid valve) cleaning
Vacuum pump valves replacement
Cleaning of the radiator
Fans cleaning
Control integrity of the pneumatic circuit
Control integrity of the electric circuit
Control thermal insulation of the chamber
Control tightening screws
Control temperature probes
Safety valve check
Grease the moving part of the lever
Level probes check
State of tank check
*
valid the condition of the reached first
Regional/national regulations fix the mandatory of autoclave validation that checks
sterilization parameters. Periodic validation must always be performed by trained
technicians using appropriate measurement instruments. In the case of non-mandatory,
validation is a voluntary operation which aims to certify that the autoclave is fully functional
and fit for sterilization of loads for which it was designed and built.
every 1 year / every 1200 cycles*
every 1 year / every 1200 cycles*
every 1 year / every 1200 cycles*
every 1 year / every 1200 cycles*
every 1 year / every 1200 cycles*
every 1 year / every 1200 cycles*
every 1 year / every 1200 cycles*
every 1 year / every 1200 cycles*
every 1 year / every 1200 cycles*
every 1 year / every 1200 cycles*
every 1 year / every 1200 cycles*
every 1 year / every 1200 cycles*
Follow
the
guidelines
manufacturer (see instructions)
every 1 year / every 1200 cycles*
every 1 year / every 1200 cycles*
every 1 year / every 1200 cycles*
ENGLISH
of
the
35

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Europa b pro 20Europa b pro 24

Table des Matières