Breville the Grind Control BDC650 Manuel D'instructions page 12

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATING YOUR BREVILLE PRODUCT
OPERATING YOUR BREVILLE PRODUCT
2. Plugging in the Power Cord
Unwind the power cord completely and insert
the power plug into a grounded 110-120V
power outlet. The LCD screen will illuminate.
NOTE
The coffee machine will enter POWER
SAVE mode after remaining idle for
5 minutes. Press any button to exit
POWER SAVE mode and re-start the
machine. Hold Menu/Exit button for
2 seconds to enter standby mode.
3. Install the Coffee Basket
For best results, we recommend pre-heating
the coffee basket by running it under hot tap
water. Dry the coffee basket thoroughly, taking
particular care to completely dry the chute
area. Line the coffee basket with either the
provided gold tone filter or a paper filter.
Never use both at the same time.
a)
Provided gold tone filter. When using
the gold tone filter, be sure that the
handle is positioned towards the hinge
area of the coffee basket. Otherwise the
handle may interfere with the flow of
ground coffee into the gold tone filter.
HANDLE TOWARDS
COFFEE BASKET HINGE
BDC650BSS_USC_IB_E20_FA.indd 11
b)
Paper filter Use an 8-12 cup, flat base
basket style paper filter with ~ 3¼"/8.25cm
base. Ensure that the paper filter is
completely open and touching the side
walls and bottom of the coffee basket.
Close the coffee basket lid. Press the OPEN
button to open the swing-out door.
Attach the coffee basket to the swing-out door
by ensuring the hinge area of the coffee basket
is firmly seated in its most downward position
on the two door hooks. Close the door until it
clicks shut.
ENSURE CHUTE
AREA IS
COMPLETELY DRY
CLICK
11
24/1/20 9:41 am

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bdc650bssBdc650bss1bca1Bdc650bssusc

Table des Matières