240 VAC Source
N
L1
120V
120V
240V
*Equipment Ground
Neutral Bus
(In Breaker Box)
7. Connect the Electrical Supplies
DANGER: Risk of electrocution. Disconnect all power before performing these installation steps.
NOTICE: All electrical work should be done by a qualified electrician.
NOTICE: All electrical wiring must be done in accordance with local codes.
NOTICE: Each steam generator requires a dedicated circuit.
Connect the Power
Turn off all electricity to the working area at the main circuit breaker panel.
Connect 240 VAC electrical line to the wires labeled "L1", "L2", and the green (ground) wire coming
out of the steam generator field service box located on top of the steam generator.
Confirm the ground connection has been made in the field service box.
Close the field service box.
Turn on the main power.
The function light should display a green light. If the function light is not green, consult the
"Troubleshooting Guide" or contact the Customer Care Center using the number located on the back
of this document.

8. Complete the Installation

Install the steam housings and steam heads following the instructions packed with the Steam
Control Kit.
Install the steam control following the instructions packed with the Steam Control Kit.
Kohler Co.
Typical Two-Pole
Circuit Breaker
L2
without GFCI
Breaker Box
*L2
240V
Ground
Green
*L1
Electrician to provide
suitable strain relief cable.
11
Black - L2
Ground
Generator
L1
L2
Black - L1
Wire Connector (3)
1059059-2-E