Kohler K-1714 Guide D'installation page 4

Masquer les pouces Voir aussi pour K-1714:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Install copper union
in water feed line.
Shut-Off Valve
Tee
Recommended
In-Line Water Filter
1. Determine the Layout
WARNING: Risk of property damage. Allow a minimum of 12" (30.5 cm) of air space between and
around all sides of the steam generators at all times. This provides an area for the heat generated
by the units to dissipate.
NOTICE: The steam generators will perform best when they are installed as close as possible to the steam
heads. Both units should be installed within 25' (7.62 m) of the steam heads.
NOTICE: For optimum performance install the steam generators below the level of the steam heads.
NOTE: When possible, use 45 degree elbows. Performance will be increased when 45 degree elbows are
used.
Determine the location of the steam generators. Allow for a 12" (30.5 cm) air gap on all sides of the
generator(s), and 12" (30.5 cm) between them. Allow for a drain pan.
Choose a drain pan appropriate for your installation. The drain pan is not supplied.
1059059-2-E
Field Service Box
Control
Cable Input
Water Feed to Steam
Generator
Pressure Relief Valve
4
Steam Head
Water
Inlet
Install copper union as close
as possible to steam generator.
Drain
Drain Pan
Steam Head
Kohler Co.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-1715

Table des Matières