Initial Operation; Lighting The Fire - HASE Lima Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6 . Initial Operation

NOTE!
During shipment, condensation moisture can
accumulate in the stove's interior, which may
possibly lead to the appearance of
condensation or water on the stove or fl ue
pipes. Please dry off these damp areas imme
diately.
The surface of your stove was treated in a sandblasting
machine before applying the colour coating. Despite careful
and thorough inspection, there may still be some residual
material in the stove body, which can fall out when your stove
is being installed.
NOTE!
To prevent any damage, please immediately
vacuum up these small steel pellets with a
vacuum cleaner.
The fi rst time a stove is operated, the heat development causes
the emission of volatile components from the coating, sealing
strips and lubricants, and smoke and odours can occur.
At a higher combustion temperature, this one-time process can
take between 4 to 5 hours.
To achieve this higher combustion temperature, please incre-
ase the fuel quantity recommended
in Section 8, „Adding Fuel/ Heating with Nominal Thermal
Output", by approximately 25%.
CAUTION!
To prevent adverse effects on health, nobody
should stay in the room(s) during this process
All manuals and user guides at all-guides.com
unless absolutely necessary. Make sure the
room is well-ventilated and open the windows
and outside doors. If needed, use a fan for
faster air circulation.
If the maximum temperature is not reached during the fi rst
heating operation, you may notice an odour for a short period
of time the next time the stove is used as well.
7.

Lighting the Fire

The fi ring up phase should be as short as possible, since
higher emissions can occur during this phase.
The slider settings described in Table 1 (see fi gure on the
right) are recommendations that were determined under
conformance testing conditions, in compliance with the
relevant standard. Depending on the weather conditions and
the draught capability of your chimney, accordingly adjust the
slider positions for your Lima to the local conditions.
NOTE!
The Lima may only be operated when the fi re
box door is closed; the fi re box door may
only be opened to add fuel.
WARNING!
Never use spirits, petrol, or other fl ammable
fl uids to light the stove.
Lighting the Fire
Procedure
Position of Control
Completely open primary
Pull secondary air
and secondary air.
slider all the way out
Open fi re grate
Pull out fi re grate slider
Pile up any remaining ash
and unburned Charcoal
into the centre of the
combustion chamber.
Place 2-3 small logs into
Open fi re box door
the middle of the fi re box;
stack approx. 0.5 kg of dry
wood chips on top.
Light the ignition material
at several places.
Close fi re box door
Tab. 1
fi g. 8
Elements
3

Publicité

Table des Matières
loading

Table des Matières