Putting Out Of Operation; Maintenance And Cleaning - Abicor Binzel ABITIG Little 9 Mode D'emploi

Masquer les pouces Voir aussi pour ABITIG Little 9:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

®
ABITIG
Little

6 Putting out of operation

7 Maintenance and cleaning

WARNING
Electric shock
Equipment parts are energized in the enterprise.
• Do not reach into the danger zone.
1 Open the shielding gas cylinder.
2 Start the welding process.
3 After ignition, hold the welding arc tight to the edge of the material to be
welded until a molten pool is formed.
4 Move the torch uniformly over the entire seam length.
5 Stop the welding process.
6 After switching off, hold the torch over the end position for a few seconds.
This allows the molten pool to solidify without atmospheric interference
under the protection of the gas which is continuing to flow.
1 Switch off power supply.
2 Close the valve of the shielding gas cylinder.
DANGER
Risk of injury due to unexpected start-up.
For the entire duration of maintenance, servicing, dismounting and repair
work, the following instructions must be adhered to:
• Switch off the power supply.
• Cut off the gas supply.
• Pull the mains plug.
DANGER
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation.
• Replace any damaged, deformed or worn parts.
6 Putting out of operation
EN - 9

Publicité

Table des Matières
loading

Table des Matières