Installation Check List

12.1

General data

Customer:
Smart Dose II Rack Type:
Date of installation:
Address:
Ph:
Ecolab field rep:
Ecolab technician:
Contact:
12.2

Water supply for the NSP / MSP

Check list
Backflow preventer required and installed
Shut-off available between the water supply and the water
valve
Dynamic water pressure adjusted to max. 2.5 bar
Maximum water temperature of 30° C stated
12.3

Mechanical Installation

Check list
Max. rack assembly upper edge heigh of 1600 mm complied
with?
Max. length of 1600 mm for the intake line complied with?
Easy access to the Smart Dose II Rack main switch
Program selection box mounted for easy access
Suction pipes identified with product labels
Jumper for the TurboSmartPump II set to match product
viscosity (left = ; centre = ; right = )
Pump 1 allocated to work with alkaline products
Pump 2 allocated to work with alkaline products
Pump 3 allocated to work with acidic products
Pump 4 allocated to work with acidic products
Wall mount stable / hex nut socket connector seating checked
Spray curtain mounted properly
All hoses installed free of kinks
Fax:
Yes
Yes
51
Installation Check List
Device number:
email:
No
Note
No
Note
417102260 Rev. 4-02.2019