Connecting The Power To The Unit; Cabling Requirements - Ingeteam INGEREV CITY Ground Manuel D'installation Et Usage

Masquer les pouces Voir aussi pour INGEREV CITY Ground:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Ingeteam

7.2.3. Connecting the power to the unit

Cabling requirements

The connection must meet certain requirements:
Connection specifications
Connection type
Number of conductors
Nominal current
Conductor maximum diameter
Connection process
1.
With the back enclosure still open, check the battery connection (red cable to positive, blue cable to
negative).
24
Single phase
2P + E
up to 32 A
10 mm
(2 x 6 mm
2
Battery
ABA2020IQM01_B - Installation and Operation Manual
Installing and connecting the unit
Three phase
3P + N + E
up to 32 A
)
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ingerev city duo

Table des Matières