Télécharger Imprimer la page

BONFIGLIOLI Vectron ACTIVE ANG 410-05 1 FA Guide Rapide page 92

Publicité

Les langues disponibles
  • FR

Les langues disponibles

NOTICE
Before unpacking the frequency inverter, transfer it as close as possi-
ble to the designated place of installation.
First, remove the protective packaging.
Screw 2 crane eyebolts into the threads provided for that purpose.
Use the crane eyebolts and a crane for lifting, handling and instal-
lation. The crane must be of a design that it can carry the weight
of the frequency inverter.
GB
92
Quick Start Guide ANG
07/20

Publicité

loading