Installation; Remote Scale Cell Connection - Dini Argeo BCSD Serie Manuel Opérateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. INSTALLATION

a) Unpack then product.
b) If present (depending on the model), it is necessary to unscrew and remove the locking screw for the transportation
placed under the scale, as shown in the figure below:
c) Level the platform by adjusting the adjustable feet until the bubble is in the centre of the level. The stability of the
platform is very important.
ALL THE CORNERS MUST REST IN A UNIFORM WAY. Carefully check that all feet fully rest on the ground and that the
platform, loaded on the corner, is not unstable (if a corner is not resting on the ground its relative foot is easier to turn).

3.1 REMOTE SCALE CELL CONNECTION

Connect the cable coming from the weighing module to the male 9-pin connector placed on the left side of the weight
indicator, using the fitted male connector.
CONNECTION SCHEME
LOAD CELL
EXC +
FEMALE CONNECTOR
1,2
MEANING
EXCITATION +
5
1,2
1,2
7
4,5
4,5
8

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bcsd6Bcsd15Bcsd30

Table des Matières