4. ASSEMBLY INSTRUCTIONS
15) The ridge cap equipment should then be secured to the wooden
collector profile using the eight steel screws and washers provided
(fig. 15);
Fig. 15
The lower, upper and side corner pieces in particular should be secured in
place (fig. 15a);
Fastening screws
Ridge cap equipment
Fig. 15a
16) At this stage, reposition the parts of the roof, minimising the empty
spaces between the roofing and the ridge cap equipment.

4.2 Assembly of two or more solar collectors

1) Remove the roofing so as to guarantee sufficient free space for the
installation of the solar panels making up the field, taking into account
the advice provided on page 7 (fig. 1);
Fig. 1
2) Position the first collector from right to left, ensuring there is at least
50 mm clearance space on the side and 280 mm underneath (fig 2);
Fig. 2
N.B.
The collector should never be rested directly onto the supporting
surface. Where not featured, arrange some wooden strips so as
to guarantee a free space between the surface and the bottom
of the solar collector;
GB
GB
33