Zephyr ARC Serie Instructions D'installation Et D'utilisation page 26

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALL THE HOOD
CAUTION: At least two installers are
recommended because of the large size
and weight of this range hood.
1. Re-install the grease fi lters and control
panel (Fig. 10/11).
2. Lift range hood into the ceiling opening.
3. Secure each support frame to the wooden
hood support frame using (6) 6 x 60 mm lag
bolts and washers provided. Fig. 32.
4. Adjust height of the telescoping support
frame to ensure a tight fi t between the hood
and fi nished ceiling.
5. Connect ductwork; Duct tape all joints to
ensure an air tight seal.
WIRING (HOOD WITH INTERNAL BLOWER/S)
1. Remove a knockout from the wiring box marked120 Vac input (Fig.33).
2. Secure the conduit to the wiring box through a conduit connector.
3. Make electrical connections. Connect white to white, black to black and green to ground.
4. Fix wiring box cover and screws (Fig.33). Make sure that wires are not pinched between
cover and box.
CONNECT:
WHITE-TO-WHITE,
BLACK,-TO-BLACK,
GREEN-TO-GROUND.
BOX MARKED
"120 VAC
INPUT"
WIRING BOX
COVER
- 26 -
2x4 WOOD
FRAME
(6) WASHERS
& LAG BOLTS
FIG.32
FIG.33

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Alu-e43Alu-e63

Table des Matières