INSTALLATION
B
PRE-INSTALLATION CHECKS
The leaf must be fixed firmily on the hinges to the pillars, must not be flexible during the
movement and must move without frictions.
Before the installation of KING, verify all dimensions etc.
There's no need for any modification, if the gate is like that shown in Fig. 1.
Gate features must be uniformed with the standards and laws in force. The gate
can be automated only if it is in a good condition and its conditions comply with the EN
12604 norm.
- The gate leaf does not have to have a pedestrian opening. In the opposite case it
is necessary to take the appropriate steps, in accordance with EN 12453 norm (for
instance; by preventing the operation of the motor when the pedestrian opening is
opened, by installing a safety microswitch connected with the control panel).
- No mechanical stop shall be on top of the gate, since mechanical stops are not safe
enough.
FIXING THE ACTUATOR ATTACHMENT TO THE COLUMN
To obtain a correct movement of the leaf gate it is necessary to respect the measures (to
see the TABLES of the measures).
COLUMN ATTACHMENT FOR KING OPERATOR
(code CCA1293 - CCA1294)
If the column is in iron, the attack can be screwed directly using four metric screws M8.
If the column is in concrete, the attack can be fixed with four expansion screws Ø 8
mm (Fig. 2-3).
In the case you have a wall parallel with the open gate, you must provide a niche in which
to place the operator.
COLUMN ATTACHMENT FOR KING L OPERATOR
(code CCA1370 - CCA1319)
To obtain a correct movement of the leaf gate it is necessary to respect the measures.
If there is an iron pillar you can weld the attachment directly.
If there is a cement pillar, you can use the fixing plate as in Fig. 5 which is fastened with
4 Fischer-screws of Ø 8 mm.
There is also the possibility to cement the attachment welding an anchor at its base
Fig. 6.
Naturally you have to respect predetermined fixing measures.
Afterwards you must weld the other actuator's attachment to the gate (Fig. 8).
In the case you have a wall parallel with the open gate, you must provide a niche in which
to place the operator.
Parts to install meeting the EN 12453 standard
Skilled persons
COMMAND TYPE
(out of public
with manned
operation
with visible impulses
(e.g. sensor)
with
not
visible
impulses
(e.g. remote control
device)
automatic
C and D, or E
* a typical example are those shutters which do not have access to any public way
A: Command button with manned operation (that is, operating as long as activated),
like code ACG2013
B: Key selector with manned operation, like code ACG1010
C: Adjustable power of the motor
D: Safety strips and/or other safety devices to keep thrust force within the limits of
EN12453 regulation - Appendix A.
E: Photocells, like code ACG8026 (To apply every 60÷70cm for all the height of the
column of the gate up to a maximum of 2,5m - EN 12445 point 7.3.2.1)
2
4
6
20
USE OF THE SHUTTER
Skilled persons
Unrestricted use
(public area)
area*)
A
B
C or E
C or E
C or E
C and D, or E
C and D, or E
3
5
7
non possibile
C and D, or E
C and D, or E
C and D, or E