Connection and Installation

The
DG1-II
is designed for the connection of the product reservoir on the right-hand side.
If required, the product reservoir can be placed on the left-hand side of the housing.
This involves moving the suction lance and the outlet for the power cable to the left-hand
side of the housing.
The following connection and installation instructions reflect the recommended method.
The connection and installation method to be used, however, depends on the actual
environmental conditions. All local regulations must be adhered to at all times.
NOTE
Housing measurements and connection diagram:
see chapter
„Hot Water".
The
DG1-II
is designed to be mounted on a wall, preferably above or close to a sink.
The water supply temperature must not exceed 30°C. In case of higher water temperatures,
a thermal mixer valve must be fitted upstream.
The water flow pressure should be at least 0.16 MPa (1.6 bar) and must not exceed
0.7 MPa (7 bar).
If the water flow pressure is > 0.4 MPa (4 bar), we urgently recommend to fit a pressure
governor in the water supply line!
The supply voltage is 230 V AC
Ex works, the unit is shipped with the suction pipe and mains cable fitted on the right-
hand side. If required, the suction pipe and the mains cable can be shifted to the left-
NOTE
hand side of the unit (see chapter 5.4).
This operation should be carried out before the unit is mounted to the wall.
Delivery:
5.1

Wall Mounting

ATTENTION
Depending on the wall condition, the use of special attachment parts may be necessary.
Be sure to mount the unit at a location high enough to be able to place a drain pan below
NOTE
the swivel drain outlet. The installation height of approx. 130 cm bottom line DG 1,
should not overstep (risk of accident when changing the can).
To mount the
 Mark drilling holes for metering unit and bracket using the supplied drilling jig.
 Drill marked holes..
 Remove cover (see Fig. 3.1, pos. 1)
for this purpose, unscrew the two cover screws (Fig. 3.1, pos. 8)
Lift the cover to remove it.
 Mount unit and bracket on the wall.
417101158_DG1.docx
9.2
„Connection Diagram „Cold Water" eg. chapter
• 1 pce. swivel drain outlet (length: 250 mm)
• 1 pce. angled valve
• 1 set of attachment parts
• 1 pce. drilling jig
• 1 pce. I & O Manual
DG 1-II
proceed as follows:
35
9.3
„ Connection Diagram