Vulcan GHCB40C Manuel D'installation Et D'utilisation page 10

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Fire Brick Installation - GHCB40/44
All GHCB40/44's come equipped with 12 center fire bricks and 8 side bricks.
The bricks must be placed in the broiler at the time of installation. The bricks are packaged in a
cardboard box, which is placed in the top broiler compartment for shipping. To install the bricks, follow
the steps below:
1. Cut through the shipping wire strap that holds the broiler grid in place if this has not already been
done.
2. Place the broiler grid into its lowest position.
SIDE FIRE BRICK
SIDE BRICK RIDGE
NOTE: Bricks are to be installed with the protruding points facing downward. Installing the side bricks
first will make the job easier (Fig. 10)
3. To install side brick, with brick in hand, points protruding downward, reach up through the broiler
grid compartment and rest the brick in the bracketing along side of the cast iron burners. It will
be necessary to tilt the bricks to get them between the burner and bracket. Then lift the brick
up above the burner and bracket, and set it carefully down in place.
NOTE: The side bricks have a ridge. This ridge should set down inside the far left and right bracket
flanges; you will install four bricks along each bracket flange (Fig. 11 and 12).
Fig. 11
PROTRUDING POINTS
Fig. 10
BRACKET FLANGE
PL-41726
– 10 –
CENTER FIRE BRICK
PL-41725-1
SIDE BRICK RIDGE
Fig. 12
BURNER
PL-41727-1

Publicité

Table des Matières
loading

Table des Matières