Delta SOLIVIA 15 EU G3 TL Manuel D'utilisation Et D'installation page 35

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 2: Check the AC utility voltage:
Using an AC voltmeter to measure the AC utility voltage and ensure the voltage is at approxi-
mately the nominal value (Nominal = 400 Vac Line-Line).
Step 3: Set all necessary settings:
Switch on AC breaker to provide power to the inverter (40 seconds)
Check the inverter display.
Country & Language settings appear on the display at fi rst startup.
Countries supported: Belgium, France, Italy, Netherlands, Spain, Greece, Germany,
Czech Republic, Slovakia, Portugal
Language supported: English, Italian, French, German, Dutch & Spanish
Set all settings for Date, Time, Inverter ID, Insulation, etc.
Step 4: Start up the inverter:
After fi nishing the basic settings, turn on DC switches (including the DC switch in inverter),
inverter will do some self-test and start countdown if no problem.
When operating, check all information on the display is correct (ex. Input voltage, current and
power; output voltage, current, power and frequency)
When solar irradiation is suffi cient, the device will operate automatically, after the self-auto test is
completed successfully (about 2 minutes on the fi rst startup of a day). Please refer to Figure 6-1
showing the LCD Display and Control Panel details. The display includes a 5" graphic LCD with
320x240 dots of resolution and a LED indicator showing inverter status. There are green and red
colored LED indicator lights to represent various inverter states of operation. Please refer to Table
6-1 for more detail on the LED indicator.
33

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Solivia 20 eu g3 tl

Table des Matières