5. Final Inspection
GB
CHECK
✔
1
✔
2
3
✔
4
✔
5
✔
✔
6
✔
7
✔
8
✔
9
10
11
(The CE Declaration can be found in the user manual as an appendix.)
Checklist
Location of the door:
1
Door plate
1.
Condition of door panel
2.
Attachment to door roller
3.
Attachment to bottom beam
4.
Welds in door panel
5.
Mounting clamp blocks
2
Bottom beam
6.
Guides
7.
Floor rubber
8.
Break-Away *
3
Guide rail
9.
Column attachment
10. Console attachments
11. Dents / scratches
26
onformity
✔
1
✔
2
3
✔
4
✔
5
✔
✔
6
✔
7
✔
8
✔
9
10
11
.
Commissioned on:
4
Drive
12. Attachment
13. Leaks
14. Motor brake
15. Adjustment limit switches
5
Tensioning and
balancing system *
16. Tension belt / elastic
17. Fastening tension belt / elastic
18. Return pulleys
19. Roll-up disks
20. Tension spring *
21. Buckle loops
22. Buckle tightened
6
Control box
23. Push buttons on the box
24. Stop switch
25. General cabling
Controls
7
26. Push buttons *
27. Pull switch*
28. Photocell + reflector *
29. Radar *
30. Induction loop *
31. Receiver *
32. Hand-held transmitter *
33. Key switch *
Declaration from engineer and/or installation firm
We declare that we have complied
with the manufacturer's
instructions in accordance with
EN13241-1 Commercial
door systems product norm
attachment IIA.
Installation company:
Street and property number:
Postcode / Place:
Phone / fax:
8
Security
34. Safety photocell *
35. Safety edge protection *
36. Light screen *
37. Iris *
9
Hood *
38. Attachment
39. Seal tightness
10
Miscellaneous
40. Maintenance sticker
41. Type plate
* if applicable
Company stamp
Place of delivery:
Date:
Name of engineer:
Signature of engineer:
GB
27