Setup And Installation; Delivery; Unpacking; Scope Of Delivery - Chloride Power Protection ACTIVE Manuel Utilisateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 120
Chloride Active

3 Setup and Installation

UK

3.1 Delivery

This unit has been thoroughly checked before shipment. Upon receipt, check the packaging and ensure that
the contents are undamaged. Any damage must be reported to the shipper and any missing parts must be
reported to the supplier immediately.

3.2 Unpacking

Care should be taken when removing the packaging in order to avoid damaging the unit. Check all packaging
materials to ensure that no items are discarded (please see below fi gures). Note that they are only descriptive
fi gures whose content is subject to changes according to local markets.
1 and 1.5kVA rack/tower units
Tower units
2 and 3kVA rack/tower units

3.3 Scope of delivery

The following items are included within the packaging:

3.3.1 Tower units (UPS)

- 1 x this user manual
- 1 x UPS unit
- 1 x quickstart guide
- 1 x CD with user software
- 2 x connection cables IEC320 C14 (male) - IEC C13 (female) for the UPS output
- 1 x RS232 interface cable
- 1 x USB cable

3.3.2 Tower units (Battery Packs)

- 1 x Battery Pack unit
- 1 x battery extension cable
- 1 x battery pack detection cable for auto-detection of number of battery packs connected

3.3.3 Rack/Tower units (UPS)

- 1 x this user manual
- 1 x UPS unit
- 1 x quickstart guide
- 1 x CD with user software
- Connection cables as per below:
11

Publicité

Table des Matières
loading

Table des Matières