Power Save Mode

all ITQ series toasters have a built-in Power Save mode. This
feature significantly reduces heat levels and energy
consumption when the toaster has not been used for a
specified period of time or when activated by the operator.
To start Power Save mode manually during operation:
1. Touch the
key.
• The conveyor belt will
speed up temporarily to
clear product from toaster.
• "Power Save" will show on
the touchpad display.
To exit Power Save mode:
1. Touch any of the program keys (keys 1–5) or place food
product between the product sensors on the conveyor belt.
The unit will be ready to toast in approximately two minutes
or less (a countdown will appear on the touchpad display).

Programming the Toaster

Intelligent Toast-Qwik
Conveyor Toasters offer several
®
programmable parameters to create toasting sequences for
custom menu items. Use the following information and
procedures to program the toaster.
Programmable Parameters
Top Heat ............Heat output level from top elements.
Setting range is 1–100
Bottom Heat ......Heat output level from bottom elements.
Setting range is 1–100
Belt Time............Total time product is in toasting chamber.
Belt Direction ....Forward—Conveyor belt moves forward
continuously (standard toaster operation).
In and Out—Conveyor belt moves product
into
programmed Belt Time, then reverses and
moves product out of the toasting chamber
back onto the feed platform.
In and In—Conveyor belt moves product
into
programmed Belt Time, then continues
forward and moves product out of the
toasting chamber to the discharge toast
chute.
Length................Length of the product to be toasted,
measurement parallel to the conveyor.
Staging ..............Continuous—Conveyor belt moves forward
continuously (standard toaster operation).
Staging—Toaster will toast a single product
and then stop until a new toasting
sequence is started by the operator.
Form No. ITQm-0214
Power Save
toasting
chamber,
pauses
toasting
chamber,
pauses
Programming a Parameter
1. make sure the toaster is
plugged
into
grounded electrical outlet of
the correct voltage, size and
plug configuration.
2. move
the
power
located on the back of the
toaster to the "On" position.
• Graphics
and
version information will appear on the display.
3. Touch and hold the
on the touchpad control for
3 seconds to activate the
toaster.
• The
preheating
lasts approximately 5–10
minutes. When the preheating cycle is complete, the
conveyor starts and the available menu items will appear
on the touchpad display.
4. Touch and hold the desired program key for 3 seconds.
• The programming menu will appear on the display
showing a list of programmable parameters.
5. Use the left-side
highlight/select the desired parameter.
6. With the parameter highlighted, use the right-side
keys to change the parameter.
• Touch the left-side "5" program key to save the changes.
• Touch the right-side "5" program key ("10" key on single
conveyor units) to cancel the changes.
for
Touchpad Control
for
for dual
conveyor unit.
Left
Conveyor
Keys
Right
Conveyor
Keys
Touchpad Control and Display (ITQ-1750-2C shown)
9
OPERATION
a
properly
switch
software
key
cycle
Preheat 5:00
keys to scroll through and
Touchpad Display
1 Bun
2 Toast
3 Hash Brown
4 Product 4