Installation; General - Hatco Intelligent Toast-Qwik ITQ Série Manuel D'installation Et D'utilisation

Masquer les pouces Voir aussi pour Intelligent Toast-Qwik ITQ Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

General

The Hatco Intelligent Toast-Qwik
with all components pre-assembled. Care should be taken when
unpacking the shipping carton to avoid damage to the unit and
the components enclosed.
WARNING
ELECTRIC SHOCK HAzARD: Unit is not weatherproof.
Locate unit indoors where ambient air temperature is a
minimum of 70°F (21°C) and a maximum of 100°F (38°C).
ExPLOSION HAzARD: Do not store or use gasoline or
other flammable vapors or liquids in the vicinity of this or
any other appliance.
FIRE HAzARD:
• Allow a minimum clearance of 1" (25 mm) along the
sides and rear of unit. Allow a minimum clearance of
12" (305 mm) in the front, measured from chamber
opening on toaster body. If safe distances are not
maintained, discoloration or combustion could occur.
• Do not locate toaster under shelving or closer than 12"
(305 mm) from the ceiling.
• Do not place anything on top of toaster. Do not place
toaster near or underneath curtains or other
combustible materials. Items near or on top of toaster
could catch fire causing injury and/or damage to the
toaster.
1. Remove the unit from the carton.
NOTE: To prevent delay in obtaining warranty coverage,
complete online warranty registration. See the
ImPORTaNT OWNER INFORmaTION section for
details.
2. Remove tape and protective packaging from all surfaces
of the unit.
Locate unit at the proper counter height in an area that is
convenient for use. The location should be level to prevent
the unit or its contents from falling accidentally and strong
enough to support the weight of the unit and contents.
NOTICE
Do not locate unit in an area subject to temperatures above
100°F (38°C) or grease from grills, fryers, etc. Excessive
temperatures and grease could cause damage to unit.
3. Place the unit in the desired location.
• make sure the unit is installed where the ambient air
temperature will not rise above 100°F (38°C) and where
it will not be exposed to excessive moisture or grease-
laden air. avoid areas that may be subject to active air
movements or currents (i.e., near exhaust fans/hoods
and air conditioning ducts).
• make sure the unit is at the proper counter height in an
area convenient for use.
• make sure the countertop is level and strong enough to
support the weight of the unit and food product.
• make sure all the feet on the bottom of the unit are
positioned securely on the countertop. a minimum shelf
depth of 22" (559 mm) is required for the unit.
Conveyor Toaster is shipped
®
CAUTION
4. Level the unit by turning the leveling feet on each leg, if
necessary.
Always operate toaster with crumb tray installed.
5. Install the crumb tray(s), if necessary.
a. Position the crumb tray directly under the conveyor belt
and above the lower conveyor support bar at the front of
the toaster.
b. Slide the crumb tray into the toaster until it stops.
Lower Conveyor
Support Bar
Installing a Crumb Tray (ITQ-1750-2C shown)
6. Install the toast chute, if necessary.
a. Slide the angled end of the toast chute into the toaster
from the front.
b. as the toast chute nears the rear of the toaster, align the
cutouts on each side of the chute with the pins inside
the toaster. make sure the angled end of the chute is
resting against the back wall of the toaster.
Toast Chute
Back wall
of toaster.
Installing the Toast Chute (ITQ-1750-2C shown)
7. Plug the unit into a properly grounded electrical receptacle of
the correct voltage, size, and plug configuration. See the
SPECIFICaTIONS section for details.
6
English
CAUTION
Crumb
Tray
Cutout
Pin
Form No. ITQm-0313

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Itq-1750-2cItq-1000-1c

Table des Matières