Section 3. Installation Instructions; Materials And Tools; Installation Requirements; Installation Requirements - Zodiac AquaPure EI 1APURE35C Guide D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English
Page 10
section 3. installation
instructions
WARning
FOR YOuR sAFETY: This product must be installed
and serviced by a professional pool/spa service
technician as described on the front cover of this
manual. The procedures in this manual must be
followed exactly. Failure to follow warning notices and
instructions may result in property damage, serious
injury, or death. Improper installation and/or operation
will void the warranty. .
WARning
EQuiPMEnT unDER PREssuRE: Always turn
pump off prior to installing or servicing the Zodiac
AquaPure Ei Series APURE35C chlorine generating
device. Your pump/filter system is operated under
pressure and the pressure must be released before
you begin work. Please see your pump/filter owner's
manual for further instructions.
Disconnect power to the system at the main circuit
breaker before performing this procedure to avoid risk
of electric shock which can result in property damage,
severe injury or death. .
Before you begin your installation, please check that
you have the right tools and a suitable location to install
the power pack and cell. Please ensure that you have
read and understood the Important Safety Instructions
section.
3.1

Materials and Tools

installation Materials Furnished
• Pipe Spacer - for 40 mm (1½ in.) pipe
• Hole Saw
• Screw Set (includes wall plugs)
• Installation and Operation Manual
Tools needed for installation
• Cordless Drill (or Power Drill)
• 6mm (15/64 in.) Hammer Drill Bit (only necessary
if drilling into brick or concrete)
• Pencil or Marking Pen
• Phillips Head Screwdriver or Phillips Head Drill Bit
Zodiac
AquaPure
Ei Series APURE35C
®
®
3.2
The Zodiac AquaPure Ei Series APURE35C chlorine
generating device must be installed horizontally with
the cell above the pipe to avoid buildup of flammable
gases which can result in FIRE OR EXPLOSION..
The installation requirements for the Zodiac AquaPure
Ei Series APURE35C chlorine generating device are as
follows:
• The power pack must be installed at least 1.5 m (5
ft.) vertically off the ground.
• The power pack must be installed at least 3 m (10
ft.) from the inside wall of your swimming pool or
built-in spa.
• The cell must be installed on a 0.4 m (1 ⅓ ft.)
horizontal length of pipe after the heaters, pumps,
and filters, as the last piece of equipment in the
circulation plumbing system just before the pool
(see Figure 3).
• The cell must be installed no more than 4.6 m (15
ft.) from the power pack (see Figure 3).
• It is recommended that the cell be installed 0.25 m
(10 in.) from any 90° elbow.
Figure 3.
|
Installation and Operation Manual

installation Requirements

WARning
4.6m (15ft.) MAX
0.4m (1

installation Requirements

Power
Pack
Cell
ft.) MIN
1/3

Publicité

Chapitres

Table des Matières
loading

Table des Matières