Setup And Installation; Ac Power; Fuse Replacement - Chauvet Professional Next NXT-1 Manuel D'utilisation

Masquer les pouces Voir aussi pour Next NXT-1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Setup And Installation

3. Setup And Installation

AC Power

The Next™ NXT-1 has an internal, auto-ranging power supplies that works with an input
voltage range of 100–240 VAC, 50/60 Hz. To determine the power requirements for the
Next™ NXT-1 refer to the label affixed to the product or Technical Specifications.
The current draw listed in Technical Specifications indicates the maximum current draw
during normal operation. For more information about current draws, download Sizing Circuit
Breakers from the Chauvet website at www.chauvetprofessional.com.
·
Always connect this product to a properly grounded and protected
circuit.
·
Never connect this product to a rheostat (variable resistor) or dimmer
circuit, even if the rheostat or dimmer channel serves only as a 0 to
100% switch.

Fuse Replacement

The Next™ NXT-1 uses a T 5 A, 250 V fuse accessible from the back of the product. To
change the fuse, do the following:
1. Disconnect the product from power.
2. With a flat-head screwdriver, unscrew the fuse holder cap from the
housing.
3. Remove the blown fuse.
4. Replace with a fuse of the same type and rating.
5. Screw the fuse holder cap back in place and reconnect power.
·
Disconnect the product from power before replacing the fuse.
·
Always replace a blown fuse with another of the same type and rating.
Page 12 of 12
Next™ NXT-1 User Manual Rev. 1

Publicité

Table des Matières
loading

Table des Matières