103704002MTL-001 TEST REPORT REV 4
TEST REPORT FOR STOVE BUILDER INTERNATIONAL INC.
Report No.: 103704002MTL-001
Date: 11/16/18
Pressure transmitter
Vacuum transmitter
Vacuum transmitter
Relative humidity
temperature meter
200 g weight
SECTION 6
LIST OF OFFICIAL OBSERVERS
NAME
Guillaume Thibodeau-Fortin, P.Eng.
Claude Paré
Claude Pelland, P.Eng.
SECTION 7
TEST PROCEDURE
From
November 1
stoves, the test was conducted in accordance with ASTM E3053-17 and ASTM E2515-11. The
fuel used for the test run was Cordwood.
The applicable EPA regulatory limits are:
Step 1 – 2015 – 4.5 grams per hour.
Step 2 – 2020 – 2.0 grams per hour with crib, 2.5 grams per hour with cordwood.
TEST SET-UP DESCRIPTON
A 6" flue is connected to a standard 6" diameter vertical single wall pipe and insulated chimney
system was installed to 15' above floor level. The single wall pipe extended to 8 feet above the
floor and insulated chimney extended the remaining height.
Version: 05/10/17
Stove Builder International Inc. | 46345 | Rev: Apr 13 2020 12:33PM | Uncontrolled Copy
SBI-298
October 15, 2019
SBI-302
June 27, 2019
SBI-305
October 12, 2019
SBI-212
June 19, 2019
SBI-312
October 09, 2023
COMPANY
Stove Builder International inc.
Stove Builder International inc.
Intertek B&C
, the unit was tested for EPA emissions. For Wood
st
th
to November 5
2018
Page 5 of 21
(5 OF 21)
1829, 32nd Avenue
Lachine, Que,H8T 3J1
Telephone: 514-631-3100
Facsimile: 514-631-1133
www.intertek.com/building
±9.5e-003 psi
±5.8e-003 in.HG
±6.1e-003 in.HG
±3%