Commissioning
6.1
Installation check
Before commissioning the measurement point make sure that all final checks have been carried out:
• Checklist "Installation check"
• Checklist "Connection check"
6.2
Switch on the device
Once the power has been connected, the field transmitter is operational.
6.3
Quick Setup
Using the Quick Setup the operator is led through all the most important unit functions, which must
be set up for standard measurement operation of the unit.
Standard set-up
®
Availability in ReadWin
2000, HART
7
(symbol
)
Function
PV mode
PV unit
Sensor
Sensor type
Sensor connection
Unit
OUTPUT
PV lower range value
PV upper range value
Safety/maintenance functions
Fault condition
Alarm ambient temperature
Further set-up for special measurement applications are possible (see Section 6.4.1).
®