Tekno Point WN-09 Manuel D'utilisation page 64

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ENGLISH
7. Wind the pipes continuously.
8. The refrigerant pipes must be provided with a separate insulation in the final part which is
connected to the condensing unit.
Note:
The power cable and the wire communication may not be the inverted.
The drain hose must be isolated at the discharge end
9. Wall mounting of the indoor unit
Once the pipe block and the cables are fixed together insert the block through the hole previously
drilled on the wall to be crossed.
Fasten the indoor unit, through the appropriate hooks, to the fixing bracket previously locked to
the wall.
Reclaim the spaces between the pipes and between pipes and holes with the sealing rubber.
Fix the pipes in the wall crossed or arrange an aesthetic containment duct fixed to the wall and
then pass the pipes inside.
Check that the indoor unit is securely locked to the support bracket and then securely fixed to the
wall.
Indoor
Wall pipe
The drain hose must not be overly covered to avoid blockage.
Note:
The drain pipe must follow the inclination of the hole in the wall as shown in the figure.
TEKNO POINT ITALIA S.R.L. - VIA DELL'ARTIGIANATO 5 - 30020 MARCON (VE) – ITALY
COMMERCIALE@TEKNOPOINT.COM –
Connection
pipe
Indoor power cord
Outdoor
Sealing gum
MUI_WINE_Ita_Eng_Fra_Deu_TP/Rev.00/Data 28.09.2020
Drain
Tape
hose
WWW.TEKNOPOINT.COM
62
Upper hook
Lower hook

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Wn-12

Table des Matières