The hole made on the supporting wall must have slope towards the outside (opposite side to the
mounting surface of the evaporator unit) with pendant to not less than 5 ° -10 °. As shown in the
following figure.
Note:
Pay attention to dust and take appropriate safety measures when performing the opening of the
hole.
2. In case you want to led the pipe posterity mind practicing of holes on the supporting wall is
necessary to drill the wall with holes of a diameter of at least 55 or 70 mm and in any case of an
appropriate size to the passage of the pipes.
When making the passage holes, respect the distances shown below.

4. Drain hose

1. The tube of the condensate drain can be carried out both laterally and breaking the flap pre-cut of
the split cover, both posterior mind right or left side where already practiced the hole for the
passage of the pipes.
The condensate drain pipe does not necessarily have to follow the path of the refrigerant gas pipe
but must necessarily have a slope of 5 ° - 10 ° towards the outside to allow the regular flow of the
condensate generated during operation.
.
TEKNO POINT ITALIA S.R.L. - VIA DELL'ARTIGIANATO 5 - 30020 MARCON (VE) – ITALY
COMMERCIALE@TEKNOPOINT.COM –
Inside
MUI_WINE_Ita_Eng_Fra_Deu_TP/Rev.00/Data 28.09.2020
Outside
Cut off the hole
WWW.TEKNOPOINT.COM
57
ENGLISH

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Wn-12

Table des Matières