Need to follow the local safety standards and to provide for appropriate protection systems on power
circuits electric.
A magnetothermal switch of suitable size must be provided in order to protect the system from possible
overloads and short circuits.
At least one isolating switch of adequate size must be provided which sections each single phase and any
neutral cable. Or a removable and easily accessible power plug at the end of the installation.
The system must be connected securely to an adequate earthing system as the failure to connect could
cause shocks, electric shocks or generate malfunctions to the units.
Install adequate section power cables before using the system.
Use only certified power and communication cables.
Make sure that the power supply matches the requirements of the system to be installed. A power supply
of frequency and / or voltage different from the one foreseen or of unstable values, or incorrect wiring will
cause malfunctions to the system or damage to the units.
Connect to a system power supply terminal is the / the cable / s phase, that the eventual neutral cable that
the earthing cable.
Make sure always to have interrupted the power supply before carrying out any work related to electrical
connections and, i n any event, follow always all the relevant safety procedures.
Do not power the system before the installation is complete.
If the power cord or communications cable is damaged no need to be replaced by qualified personnel.
Keep distance or use special insulation between the power cables and the communication and the piping of
gas because the high temperatures of the pipes could damage the cables.
The system must be installed following the current regulations relating to electrical systems and systems
with fluorinated gases.
The installation must be carried out in compliance with the requirements of IEC, NEC and CEC or equivalent
and exclusively by qualified personnel.
The air conditioner is the first class electrical equipment. It must be properly grounded with a dedicated
grounding device. The earthing system must have been built by professionals in compliance with current
regulations.
During installation, make sure that an earthing system exists and that the units are connected to earth
efficiently as electric shocks or electric shocks or malfunctions could occur.
The yellow-green cable identifies the grounding cable and must never be used for other purposes.
The earthing resistance must comply with current national electrical safety regulations.
The switch or the power plug of the unit must always be easy to access by users at the conclusion.
All power and communication cables must be installed by qualified personnel. If the power cable is of
insufficient length, replace it with one of adequate length. Do not ever joints more cables.
In installations that do not include the power plug, a disconnector installed on the line and a must be
provided.
Moving the air conditioner from one place to another must only be carried out by qualified personnel in
order not to incur physical injury or damage the units.
Provide always places the installation of the units outside of the reach of children or pets. If it is not
possible to install the units in safe places, it is necessary to provide safety protection systems (protective
grids or similar) that prevent children or pets from coming into contact with the units.
TEKNO POINT ITALIA S.R.L. - VIA DELL'ARTIGIANATO 5 - 30020 MARCON (VE) – ITALY
COMMERCIALE@TEKNOPOINT.COM –
WWW.TEKNOPOINT.COM
MUI_WINE_Ita_Eng_Fra_Deu_TP/Rev.00/Data 28.09.2020
42

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Wn-12

Table des Matières