UP Series Maintenance Schedule
PERIOD
MAINTENANCE
Each
24
hours
Check the coolant level and replenish if
operation
necessary.
Visual
check
of
Report immediately, contact Ingersoll R and
machine
for
any
authorized distributor for assistance if in
leaks, dust build up
doubt
or unusual noise or
vibration
When compressor is
Drain air receiver of condensate, or check
receiver mounted
that automatic drain is operating
Visual check
Blow clean if needed
condition of package
pre–filter
If the air filter
Check the Condition of filter. Change the air
indicator locks into
filter if needed. Dusty environments require
the red position
more frequent replacement or, optional high
before the 2000
dust filter
hour/1 year change
(The indicator sould be checked with the
out period
unit stopped.)
First 150 hours
Change the coolant filter.
Each month or 100
Remove and clean package pre-filter,
hours
replace if needed
Check the cooler(s) for build up of foreign
matter. Clean if necessary by blowing out
with air or by pressure washing.
Each year or
Change the coolant filter.
2000 hours
Check motors with grease fittings and
grease bearings per motor data tag.
Check scavenge screen for blockage, clean
if required.
Change the separator cartridge.
Change the Air Filter element.
Take coolant sample for fluid analysis.
Change the package pre–filter.
Check the inlet valve flapper, recondition as
necessary.
Visual Check of Drive Belts and tensioning
gas spring.
Pressure vessel
Separator vessel and air receiver when
inspection
fitted.
frequency may be
Fully inspect all external surfaces, and
otherwise defined by
fittings. Report any excessive corrosion,
local
or
national
mechanical or impact damage, leakage or
legislation.
other deterioration.
Every two years or
Change drive belt and gas spring.
8000 hours
Replace the Ultra Coolant at whichever
interval occurs first.
Check and replace all items included within
2000 hour service
Strip, clean and re–Grease motor bearings
of ODP motors.
Fit the following reconditioning parts as
appropriate:
Solenoid valves, Inlet valve kit, Minimum
Pressure valve kit, Thermostatic Valve Kit
Replace all hoses.
Every 4 years or
16000 hours
Strip, clean and re–Grease motor bearings
on motors with grease fittings.
Replace sealed bearing on motors
without grease fittings.
Fit replacement electrical contactor tips.
Separator tank .
6 years/16000 hours
Remove the cover plate and any necessary
or as defined by
fittings. Clean the interior thoroughly and
local or national
inspect all internal surfaces.
MAINTENANCE
ROUTINE MAINTENANCE
This section refers to the various components which require
periodic maintenance and replacement.
It should be noted that the intervals between service requirements
may be significantly reduced as a consequence of poor operating
environment. This would include effects of atmospheric contamination
and extremes of temperature.
The SE R VICE/MAINTENANCE
components' descriptions and the intervals when maintenance has to
take place. Oil capacities, etc., can be found in the GENERAL
INFORM ATION section of this manual.
Compressed air can be dangerous if incorrectly handled. Before
doing any work on the unit, ensure that all pressure is vented from the
system and that the machine cannot be started accidentally.
CAUTION: Before beginning any work on the compressor, open,
lock and tag the main electrical disconnect and close the isolation
valve on the compressor discharge. Vent pressure from the unit
by slowly unscrewing the coolant fill cap one turn. Unscrewing
the fill cap opens a vent hole, drilled in the cap, allowing pressure
to release to atmosphere. Do not remove the fill cap until all
pressure has vented from the unit. Also vent piping by slightly
opening the drain valve. When opening the drain valve or the
coolant fill cap, stand clear of the valve discharge and wear
appropriate eye protection.
Ensure that maintenance personnel are properly trained,
competent and have read the Maintenance Manuals.
Prior to attempting any maintenance work, ensure that:–
.
all air pressure is fully discharged and isolated from the system. If
the automatic blowdown valve is used for this purpose, then allow
enough time for it to complete the operation.
.
the machine cannot be started accidently or otherwise.
.
all residual electrical power sources (mains and battery) are
isolated.
Prior to opening or removing panels or covers to work inside
a machine, ensure that:–
.
anyone entering the machine is aware of the reduced level of
protection and the additional hazards, including hot surfaces and
intermittently moving parts.
.
the machine cannot be started accidently or otherwise.
Prior to attempting any maintenance work on a running
machine, ensure that:–
DANGER
Only properly trained and competent persons should
undertake any maintanence tasks with the compressor running or
with electrical power connected.
.
the work carried out is limited to only those tasks which require the
machine to run.
.
the work carried out with safety protection devices disabled or
removed is limited to only those tasks which require the machine to be
running with safety protection devices disabled or removed.